We've gotten the guts and all the junk that was in the little house ripped out. All the walls were torn down to frame, and the interior walls were removed because they were rotten and not made very well anyway. Chad & Chris (who've very graciously offered free experienced labor) got a new door installed today and fixed most of the floor. By this time next weekend, the interior walls should all be framed up and most of the plumbing and electrical should be done. Remodeling is a lot of work.
I've decided though, that I shouldn't play with sharp objects. In the past two weeks, I've got at least two dozen small cuts and bruises in different parts of my body because of the work I've been doing. That's an interesting switch though not having most of my injuries caused by Rachel.



